Skip to content

Port bow planks removed ….

Work is progressing quickly at the bow section of the ship.   The 2 photos show the change from 2/9/2017 to 16/9/2017.  In these two weeks the port planks forward of the bow thruster frames have been removed. The frames have been exposed for inspection and some of the ceiling planks have been removed from the chain locker and the crew cabin.

Advertisements
%d bloggers like this: