Deck Preparation work in April

April 25, 2022
Timber blocking pieces are being installed to support the outer edge of the plywood deck layers. These pieces are just inboard of the yet to be installed margin and cover boards which form the very edge of the deck and surround the stanchions. This has been a lengthy process as each piece of blocking is unique in shape and individually fitted.
Finished blocking rebated into deck beams and knees, faired and ready to receive the first layer of plywood decking.
The beams and carlins around the opening of the engine room deckhouse are being prepared for the later reinstallation of the deckhouse.
In several areas of the ship, supports are being installed for later attachment of grey water tanks or other tanks or machinery.
Framing for the sole of the captains cabin being installed by one of our volunteers.

From → Uncategorized

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: