Completion of Deck Beams

November 9, 2021
The last two replacement deck beams have been laminated and placed in position. The one in the foreground sits in its final location on the bulkhead between the engine room and the accomodation wet areas. The other beam forward of this is still supported by a sling above its final position. What looks like a dividing wall under the centre of this beam, is the aft centre board casing.
Looking aft over the same area shows the beams complete around the opening above the engine room. When the final beams are bolted in place, the shipwrights will begin the process of fairing the top of all beams in preparation for laying the deck.