Skip to content

Propeller shaft work

March 8, 2021
A steel tube has been fabricated as a boring bar to enlarge the pilot hole previously drilled on the propeller shaft alignment. The hole will be enlarged till it matches the stern tube to be inserted through the planking and frames.
Inside the engine room showing the recently completed engine beds for the starboard engine and the boring bar.

From → Uncategorized

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

<span>%d</span> bloggers like this: