The 53 frames of the Alma Doepel hull have been fixed in position after a great 2 week effort by shipwrights and volunteers.  The frames need to be planed to give the correct shape. This requires many hours of measuring, examining the line of sight and positioning of battens as reference points for shaping the frames. The battens show where excess timber needs to be planed off the frame and in some places timber needs to be added to the frame.