Volunteers at work ….

August 4, 2018

The preparation and painting of the steel keel shoe is still a work in progress for several volunteers. All steel surfaces are cleaned with wire brushes, of all paint and rust before being painted.

AD 03082018 (1)

The decking on the port fore deck has had the caulking removed and is now being lifted.

AD 03082018 (4)

All the dumps are being removed and the timber of all beams are being assessed for repairs or replacement. The dump pulling machine has been manufactured in-house by volunteers. Works really well.

 

Advertisements
Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: