Skip to content

Frame sections removed ….

June 15, 2018

A section from several frame has been removed to allow timber attached to the keelson to be inspected. The frames adjacent – port and starboard – to the forward centre board casing  have been detached and shortened from the dove tail joint. The large timber attached to the keelson needed to be exposed and removed to assess whether it was sound or needed repairing or replacing. This link is to a short you tube video showing the gap after the frame sections were removed.

Advertisements

Comments are closed.

%d bloggers like this: