Skip to content

Pinrail repairs ….

August 24, 2017

A section of the aft pinrail had several soft sections of timber that needed replacing. All the soft timber was removed and graving pieces ( the new looking timber ) shaped to fit. When the shaped timber fits to within the millimeter it can be glued and doweled into place. Timber sections repaired like this are then stained, varnished or painted before being returned to their position on the ship.

Advertisements

Comments are closed.

%d bloggers like this: