Ongoing work …

March 7, 2017

AD 04032017 (9)

The eight extra laminations have been completed and are now being shaped. The laminations were needed as the girth of the spar was several millimeters “skinny” and now some of the extra timber will be planed off until the correct profile is achieved.

AD 04032017 (10)

Block construction continues with the edges of a double block being routed on the router table. All blocks – single, double or triple – have the edges routed to the same shape.