Skip to content

Ongoing work …

March 7, 2017

AD 04032017 (9)

The eight extra laminations have been completed and are now being shaped. The laminations were needed as the girth of the spar was several millimeters “skinny” and now some of the extra timber will be planed off until the correct profile is achieved.

AD 04032017 (10)

Block construction continues with the edges of a double block being routed on the router table. All blocks – single, double or triple – have the edges routed to the same shape.

Advertisements
Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: