Skip to content

Stern braces or correctly floors ….

February 19, 2017

ad-17122016-ready-5ad-17122016-ready-17

A temporary brace was installed on the port and starboard side of the stern post for strength and rigidity.

ad-04022017-ready-9

The permanent braces called floors, of galvanized steel,  were fabricated off site and delivered to Shed 2.

Permanent braces ie floors  installed.

Save

Advertisements

From → Alma Doepel, hull

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: