Skip to content

Planking progress …

June 12, 2016

11062016 AD ready  (1)

Three strakes have been shaped and fixed at the bow. The planks are tapered and as yet not attached permanently. The visible bolt heads will be counter sunk into plank and the hole filled with hardwood plug. The holes seen in the sheer strake ( top plank ) have the bolts permanently in place but still need to be plugged.

Looking aft showing the great work that has been done in the last week. The 2nd and 3rd rows of strakes and another ready on the scaffolding.

Advertisements

From → Alma Doepel, planking

Comments are closed.

%d bloggers like this: