Skip to content

Deck beam ….

February 2, 2016

The deck beam in the master’s cabin has been the focus of work during the last several weeks. All holes have been drilled out and plugs glued into the holes. Where ever bolts need to be placed in the future new holes will be drilled for them. The lodging knees near the deck beam have been repaired or replaced and have also been undercoated with Hempel Uniprimer.

masters deck beam AD 22012016  ready  (1)

 

masters deck beam AD 22012016  ready  (2)

 

masters deck beam AD 22012016  ready  (3)

 

masters deck beam AD 22012016  ready  (4)

 

masters deck beam AD 22012016  ready  (5)

 

 

Advertisements

Comments are closed.

%d bloggers like this: