Skip to content

Steam production ….

December 20, 2015

An unpressurised vessell with an electrical element will produce steam to be fed into a large pipe containing 2 planks. The heated planks are then shaped to their relevant positions on the hull.  At present the planks are being wrapped in situ in plastic and steamed. The new system will be more efficient ( 2 planks at a time ) and quicker. If funding allows for work to continue next year, more photos showing the new system in operation. AD 19122015  steam generator  ready (1)AD 19122015  steam generator  ready (2)

Advertisements

Comments are closed.

%d bloggers like this: