Skip to content

Repaired lodging knees ….

September 21, 2015

AD knees 19092015 ready (1) AD knees 19092015 ready (2)

Two of the repaired lodging knees back in their original position in the hull of the Alma Doepel. These knees were repaired or rebuilt with funds from the letsact crowd funding effort. This raised in excess of $5000 for the restoration of the lodging knees.

All lodging knees have been placed back on the ship and a few still need to be repaired to complete the work.

Advertisements

Comments are closed.

%d bloggers like this: