October 2013 Revisited 7

September 7, 2015

21 Sept 2013 repairs to frames ready (1) 21 Sept 2013 repairs to frames ready (2)

Shipwrights commenced replacing and repairing the frames of the Alma Doepel.

Planks had been removed to the water line and all timber in the frames inspected and sections of rot or worm infestation were identified. The shipwrights, fabricated replacement sections in Shed 2 to fit to the hull.

5 Oct 2013  storm damage  ready (6) 5 Oct 2013  storm damage  ready (5)

Storms damaged the awnings that protected the Alma Doepel from the elements. The old sections were used to cover the plank timbers in the shed and new awnings were donated and fitted to the existing framework.