Skip to content

“New” mooring post timber

July 28, 2015
SAMSUNG

A large section of hardwood has been found to fabricate the fourth mooring post for the Alma Doepel.  The timber is being squared and “milled” to the same thickness. Any imperfections in the timber will be rectified with graving pieces.  The correct dimensions will be attained by laminating the entire length with similar hardwood timber. Shaping and painting will then have the post ready to be fitted back on the Alma.

Advertisements

Comments are closed.

%d bloggers like this: