May 2013 Revisited 6

July 16, 2015

25 May 2013 stripping down AD ready (22) 25 May 2013 stripping down AD ready (27) 25 May 2013 stripping down AD ready25 May 2013 stripping down AD ready (29) 25 May 2013 stripping down AD ready (18) 25 May 2013 keel steel primed  ready

As soon as the Alma Doepel was back at Shed 2 North Wharf, Docklands the task of stripping the hull back to bare wood started. Canvas, copper sheet and even cement were removed to reveal the real state of the planking and the enormity of the task ahead. The steel exterior of the wooden keel was cleaned and primed for immediate protection.