Continuing work on the four mooring posts

June 22, 2015

mooring posts 20062015 ready (5)mooring posts 20062015 ready (4)mooring posts 20062015 ready (2)mooring posts 20062015 ready (3) mooring posts 20062015 ready (9)mooring posts 20062015 ready (6)mooring posts 20062015 ready (8) mooring posts 20062015 ready (7)

Several before and after photos of the work being done on the 4 lodging posts. Each post has had any soft wood removed by planing, thicknesser, router and chisel. Graving pieces and laminates then bring the posts back to original size and strength. Each post is to be placed in its original position on the ship, ie aft port, aft starboard  etc.