Skip to content

Repairs continue on 2 lodging knees

April 4, 2015

repairing lodging knees  ready 04042015 (1) repairing lodging knees  ready 04042015 (10) repairing lodging knees  ready 04042015 (8) repairing lodging knees  ready 04042015 (7) repairing lodging knees  ready 04042015 (6)

Lodging knee No.1 – shall we say – is being laminated with iron bark timber salvaged from the rubbing strake or belt of the Alma Doepel.

repairing lodging knees  ready 04042015 (2) repairing lodging knees  ready 04042015 (3) repairing lodging knees  ready 04042015 (4) repairing lodging knees  ready 04042015 (5) repairing lodging knees  ready 04042015 (9)

Lodging knee No. 2 is receiving the same restoration to the original dimensions for refitting to the hull.

Advertisements

Comments are closed.

%d bloggers like this: