Progress with the mooring posts

March 12, 2015

12032015 ready (7)

Deft chisel work has removed soft timber and a graving piece will be inserted.

12032015 ready (5) 12032015 ready (4)

Small sections of rotted timber and large cracks have developed below the deck level and will be rectified.

12032015 ready (3) 12032015 ready (2)

The post that had a large section removed with the band saw needs more split timber removed from one end and the laminations of timber will restore the post to its original shape.

12032015 ready (1)

Saw cuts and chiselling prepare this post for shallow laminating in place of the rotted surface wood.