Four mooring posts being refurbished

March 11, 2015

AD 07032015 (2) ready AD 07032015 (3) ready AD 07032015 (4) ready

AD 07032015 (12) ready

AD 07032015 (7) ready AD 07032015 (8) ready

AD 07032015 (9) ready

The 4 mooring posts from the Alma Doepel have been removed and are in the work shop for inspection and repair. Most of the timber is in good condition but many graving pieces will be needed for the repairs. The band saw was used to remove the largest section of rotted wood. Two laminations will be needed to repair this post to full strength. Some of the volunteers have become extremely skilled at repairing the timbers of the boat.