Skip to content

Some catching up needed for the last 2 months.

June 1, 2014

 

Image

Image

Image

One of the small boats in Shed 2 has been refurbished and is apparently to be used in some scenes in a film.

The boat hull has been stripped, sealed and caulked. It has been floated for several days and now floats without leaking.

Image

Image

The flooring was upgraded and new parts made to complete the floor.

 Image

Spars, rigging and sails have been made locally and fitted.

 

 

 

 

 

 

 

Advertisements

From → dinghy

Comments are closed.

%d bloggers like this: