Jan 19th 2013 1

Another spar nearly finished

Jan 19th 2013 8

A sheaf being sandblasted ready for a coat of galvanised paint

Jan 19th 2013 7

Dried Elm being reduced to the correct thickness for the block reconstruction

Jan 19th 2013 4

 Cetol coat being applied to some inside  furniture